The growth of Trans Atlantic Group is triggered through the following values inculcated in our operational methodology throughout the organization and in all operating geographical regions.
Trans Atlantic Group, a youthful company, which envisions to provide value added services to its esteemed customers’ offering comprehensive solutions in the realm of Engineering & Construction, Project Management, Specialized Oilfield Support Services , Specialized Logistics Services , Material Handling Services , Operation and Maintenance Services , General Trading and allied operation.
Here is a glimpse of various endeavors handled by TAG for its esteemed client – KUWAIT OIL COMPANY and its associate Contractors in various domains with a wide range of projects.
Project Name: Transportation & Support Services for DCF | |
Scope Description: | Supply and Operations of Trucking Fleet inclusive of Vacuum Tankers , Bulkers , Flat Bed Trailers, Forklifts etc including manpower viz., Drivers / Operators / Fleet Coordinators / Plant Operators/ Mechanics / Helpers etc on 24x7 basis. |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | BAKER HUGHES , GE Company |
Contract Ref: | KOC #16051458 Project # F012011 |
Project Start: | KOC #16051458 Project # F012011 |
Project Duration: | KOC #16051458 Project # F012011 |
Project Location: | Based in North Kuwait & South Kuwait Mud Plants with operational coverage in entire KOC & Ratqa fields. |
Project Name: Transportation & Support Services | |
Scope Description: | Supply and Operations of Trucking Fleet inclusive of Vacuum Tankers , Bulkers , Flat Bed Trailers, etc including manpower viz., Drivers / Operators etc |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | BAROID , Halliburton |
Contract Ref: | KOC# 17052134 Project # 9610039152 |
Project Start: | November , 2017 |
Project Duration: | Ongoing |
Project Location: | Based in North Kuwait Mud Plant with operational coverage in entire KOC & Ratqa fields. |
Project Name: Bulk Chemical Supply Project In Joint Operations | |
Scope Description: | Supply & Operations of Distribution Tankers, Down Hole Batch Chemical Treatment Trucks, Bulk Delivery Tankers, Cleaning Trucks & Vacuum Tankers including manpower viz., Drivers / Operators etc |
Client: | JOINT OPERATIONS |
Prime Contractor: | WEATHERFORD Kuwait For Petroleum Services |
Contract Ref: | JO # JO/SC238/A112 Project # WFK-TAG-JO-0100-2013 |
Project Start: | December , 2013 |
Project Duration: | Ongoing |
Project Location: | Joint Operations, AL Wafra , Kuwait |
Project Name: Transportation & Lifting Services | |
Scope Description: | Lifting & Trucking Operations with Cranes & Trailers including manpower viz., Drivers / Operators etc on 24x7 basis. |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | BJ Services Company - BHGE |
Contract Ref: | BJ Services Company - BHGE |
Project Start: | March , 2015 |
Project Duration: | 01 Yr |
Project Location: | Based at BJ Operations Yard in Ahmadi , Kuwait covering various oilfield areas of Kuwait |
Project Name: Material Handling & Warehousing Services for GC 32 – New Gathering Centre for SEK | |
Scope Description: | Material Handling Services using Equipments like Cranes , Forklifts, Flat Bed Trailers , Boom trucks , Telehandlers etc & with qualified skilled Manpower like Material Supervisors , Rigging Supervisors, Riggers, Warehouseman, Helpers , Equipment Operators , Drivers etc. |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | Petrofac International Ltd |
Contract Ref: | KOC # 17051820 Project # JI-2035/30-002 |
Project Start: | May , 2018 |
Project Duration: | Ongoing |
Project Location: | New Gathering Centre, GC 32 Project site is located inside KOC, South East Kuwait |
Project Name: Material Handling Services for Warehouse Management | |
Scope Description: | Material Handling Services using Equipments like Cranes , Forklifts, Flat Bed Trailers , Boom trucks , Telehandlers etc & with qualified skilled Manpower like Material Supervisors , Rigging Supervisors, Riggers, Warehouseman, Helpers , Equipment Operators , Drivers etc. |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | Petrofac International Ltd |
Contract Ref: | KOC # 15051614 Project # JI-2031/30-001 |
Project Start: | January , 2016 |
Project Duration: | Ongoing |
Project Location: | Manifold Group Trunkline (MGT) System for GC-29,30 & 31 Project site, Abdally, North Kuwait |
Project Name: Support Services for Material Handling At LFHO Site(S) North Kuwait & STF Area South Kuwait | |
Scope Description: | Material Handling Services using Equipments like Cranes , Forklifts, Flat Bed Trailers , Boom trucks , Telehandlers etc & with qualified skilled Manpower like Material Supervisors , Rigging Supervisors, Riggers, Warehouseman, Helpers , Equipment Operators , Drivers etc. |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | Petrofac International Ltd |
Contract Ref: | KOC # 15050901 Project # JI-2029/31-001 |
Project Start: | September , 2016 |
Project Duration: | Ongoing |
Project Location: | LFHOD Sites -CPF – Rawdathein, North Kuwait & LFHOD-STF, Magwa, South Kuwait |
Project Name: Material Handling Services for Warehouse Management | |
Scope Description: |
Material Handling Services using Equipments like Cranes , Forklifts, Flat Bed Trailers , Boom trucks , Telehandlers etc & with qualified skilled Manpower like Material Supervisors , Rigging Supervisors, Riggers, Warehouseman, Helpers , Equipment Operators , Drivers etc. |
Client: |
KUWAIT OIL COMPANY (KOC) |
Prime Contractor: |
Petrofac International Ltd |
Contract Ref: |
KOC # 15051614 Project # JI-2031/30-001 |
Project Start: |
January , 2016 |
Project Duration: |
Ongoing |
Project Location: |
Manifold Group Trunkline (MGT) System for GC-29,30 & 31 Project site, Abdally, North Kuwait |
Project Name: Material Handling Services for Warehouse Management for GC 29 | |
Scope Description: |
Material Handling Services using Equipments like Cranes , Forklifts, Flat Bed Trailers , Boom trucks , Telehandlers etc & with qualified skilled Manpower like Material Supervisors , Rigging Supervisors, Riggers, Warehouseman, Helpers , Equipment Operators , Drivers etc. |
Client: |
KUWAIT OIL COMPANY (KOC) |
Prime Contractor: |
Petrofac International Ltd |
Contract Ref: |
KOC # 14050476 Project # JI-2027/30-001 |
Project Start: |
June , 2015 |
Project Duration: |
Ongoing |
Project Location: |
New Gathering Centre, GC 29 site in North Kuwait |
Project Name: Operation & Maintenance Services for GC 32 New Gathering Centre for SEK | |
Scope Description: |
Operations & Maintenance of Temporary Site office facilities including Operational logistics of Fuel Supply Tankers , Potable Water Supply Tankers, Sewage Tankers , Vacuum Tankers , Garbage Trucks , Mass Transportation Buses and using a manpower pool of Office Boys, Janitors, Technicians , Mechanics, Supervisors etc. |
Client: |
KUWAIT OIL COMPANY (KOC) |
Prime Contractor: |
Petrofac International Ltd |
Contract Ref: |
KOC # 17051820 Project # JI-2035/30-001 |
Project Start: |
May , 2018 |
Project Duration: |
Ongoing |
Project Location: |
New Gathering Centre, GC 32 Project Site located inside KOC, South East Kuwait |
Project Name: Effluent Water Injection Phase 1 & Seawater Injection Phase 2 | |
Scope Description: |
Material Handling Services using Equipments like Cranes , Forklifts, Flat Bed Trailers , Boom trucks , Telehandlers etc & with qualified skilled Manpower like Material Supervisors , Rigging Supervisors, Riggers, Warehouseman, Helpers , Equipment Operators , Drivers etc. |
Client: |
KUWAIT OIL COMPANY (KOC) |
Prime Contractor: |
Petrofac International Ltd |
Contract Ref: |
KOC # 45654 Project # JI-2004 |
Project Start: |
January , 2011 |
Project Duration: |
02Yrs |
Project Location: |
North Kuwait CIPF, CG15/25, CG23, SWTP & Laydown Area (near KOC Security Gate) |
Project Name: Manifold Group Trunkline (MGT) System for GC-29, 30 & 31 Project | |
Scope Description: | Operations & Maintenance of Temporary Site office facilities including Operational logistics of Fuel Supply Tankers , Potable Water Supply Tankers, Sewage Tankers , Vacuum Tankers , Garbage Trucks , Mass Transportation Buses and using a manpower pool of Office Boys, Janitors, Technicians , Mechanics, Supervisors etc. |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | Petrofac International Ltd |
Contract Ref: | KOC # 15051614 Project # JI-2031/30-001 |
Project Start: | January , 2016 |
Project Duration: | Ongoing |
Project Location: | Manifold Group Trunkline (MGT) System for GC-29,30 & 31 Project, Abdally, North Kuwait |
Project Name: Lower Fars Heavy Oil Development Program (Phase1), Kuwait | |
Scope Description: | Operations & Maintenance of Temporary Site office facilities including Operational logistics of Fuel Supply Tankers , Potable Water Supply Tankers, Sewage Tankers , Vacuum Tankers , Garbage Trucks , Mass Transportation Buses and using a manpower pool of Office Boys, Janitors, Technicians , Mechanics, Supervisors etc. |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | Petrofac International Ltd |
Contract Ref: | KOC # 15050901 Project # JI-2029/30-002 |
Project Start: | July, 2015 |
Project Duration: | 06 Months |
Project Location: | LFHO Sites -ISS Office Located to the North of Kuwait. |
Project Name: GC29 New Gathering Centre, Operation & Maintenance for the Site Facilities | |
Scope Description: | Operations & Maintenance of Temporary Site office facilities including Operational logistics of Fuel Supply Tankers , Potable Water Supply Tankers, Sewage Tankers , Vacuum Tankers , Garbage Trucks , Mass Transportation Buses and using a manpower pool of Office Boys, Janitors, Technicians , Mechanics, Supervisors etc |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | Petrofac International Ltd |
Contract Ref: | KOC # 14050476 Project # JI-2027/30-001 |
Project Start: | June , 2015 |
Project Duration: | Ongoing |
Project Location: | New Gathering Centre, GC 29 Sites in North Kuwait |
Project Name: Operation & Maintenance of TCF for Project-New Distribution Network for North Kuwait ESPs | |
Scope Description: | Operations & Maintenance of Temporary Site office facilities including Operational logistics of Fuel Supply Tankers , Potable Water Supply Tankers, Sewage Tankers , Vacuum Tankers , Garbage Trucks , Mass Transportation Buses and using a manpower pool of Office Boys, Janitors, Technicians , Mechanics, Supervisors etc. |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | Petrofac International Ltd |
Contract Ref: | KOC # 12050504 Project # JI-2015 |
Project Start: | January , 2013 |
Project Duration: | 1.5Yrs |
Project Location: | JI2015 Project Sites , Inside KOC , North Kuwait |
Project Name: Effluent Water Injection Phase 1 & Seawater Injection Phase 2 | |
Scope Description: | Operations & Maintenance of Temporary Site office facilities including Operational logistics of Fuel Supply Tankers , Potable Water Supply Tankers, Sewage Tankers , Vacuum Tankers , Garbage Trucks , Mass Transportation Buses and using a manpower pool of Office Boys, Janitors, Technicians , Mechanics, Supervisors etc. |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | Petrofac International Ltd |
Contract Ref: | KOC # 45654 Project # JI-2004 |
Project Start: | January , 2011 |
Project Duration: | 02.5 Yrs |
Project Location: | At KOC North Kuwait Sites near CIPF, GC15, GC23, GC25, SWTP & Laydown Area (near KOC Security Gate #1) |
Project Name: Installation of Fuel Gas & Gas Oil Pipelines and Pumping station | |
Scope Description: | Operations & Maintenance of Temporary Site office facilities including Operational logistics of Fuel Supply Tankers , Potable Water Supply Tankers, Sewage Tankers , Vacuum Tankers , Garbage Trucks , Mass Transportation Buses and using a manpower pool of Office Boys, Janitors, Technicians , Mechanics, Supervisors etc. |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | Petrofac International Ltd |
Contract Ref: | KOC # 45583 Project # JI-2003 |
Project Start: | November , 2010 |
Project Duration: | 02Yrs |
Project Location: | Project Sites at AL Wafra, Mina Azzour, Mina Ahmadi- South Kuwait |
Project Name: REPLACE OF BUILDING #2111 | |
Scope of Work |
Provide all design, material, supervision, labor, equipment and transportation to building #2111. |
Client: |
US Air force – Ali Al Salem Airbase |
Prime Contractor: |
US Air force |
Contract #: |
FA5703-11-C-0005 |
Date of Award: |
Jan 2011 |
Duration: |
60 days |
Project Name: CONSTRUCTION OF CONCRETE BASE FOR LATRINE UNIT AND INSTALLATION OF PORTABLE LATRINE UNIT, WATER TANK AND SEPTIC TANK | |
Scope of Work |
Removal of existing latrine trailer, sewage tank and installation of new latrine unit with concrete floor and tanks as per SOW |
Client |
US AIRFORCE |
Location |
Abdullah Mubarak Air Base, Kuwait |
Date of Award |
April 2009 |
Reference Contact/ Buyer |
Lt JaymieStepanek |
Project Name: INSTALLATION OF NEW POWER DISTRIBUTION SYSTEM TO REPLACE THE EXISTING ONE AT SUNSHADE 10 ON ABDULLAH AL MUBARAK AIR BASE | |
Client |
U.S. Air Force |
Location |
Abdullah Mubarak Air Base, Kuwait |
Contract Number |
F38604-10-M-Y030 |
Date of Award |
May 2010 |
Duration |
1 month |
Project Name: INSTALLATION OF PAX LATRINE | |
Company / Organization |
USAF, Airbase, Kuwait |
Contract Number |
F38604-09-M-Y020 |
Date of Award |
June 2009 |
Project Name: CONSTRUCTION AND SUPPLY OF PRE FABRICATED OFFICE UNITS INCLUDING SITE OFFICE UNITSSITE PREPARATION, CONCRETE PADS, SUPPORTING POWER GENERATION FACILITIES AND FUERL TANKS | |
Company / Organization |
US Army Contracting Command, Kuwait |
Contract Number |
W912D1-09-P-0269 |
Date of Award |
Sept 2009 |
Project Name: TURN-KEY MAN CAMP PROJECT AT CAMP FALCON, IRAQ | |
Scope of Work |
- Fabrication, Installation and commissioning of facilities For 754 Army Personnel at LSA Camp Falcon VP22187.Cast in place concrete foundation for potable water, electrical infrastructures, and concrete lift stations.Design and install Electrical Infrastructure including power generation. Design, procure and install potable water infrastructure and waste water infrastructure. Procure and install living unit trailers and shower and latrine trailers. Installation of force protection and supply and installation anchor blocks for rig. |
Client |
U.S. Army, Iraq |
Prime Contractor |
Kellogg Brown & Roots (KBR) –Camp Liberty – Baghdad |
Contract Number |
GCA8YM-VC0SF00233 |
Date of Award |
May 2008 |
Duration |
3 months |
Project Name: DESIGN AND CONSTRUCT 38 FT X 44 FT X 16 FT METAL OVERHEAD COVER AND ASSOCIATED CONCRETE RAMPS AT CAMP PROSPERITY, BAGHDA |
Client |
U.S. Army, Iraq |
Prime Contractor |
Kellogg Brown & Roots (KBR) –Camp Liberty – Baghdad |
Contract Number |
GCA8YM-VC-SF10067 |
Date of Award |
January 2009 |
Project Name: DESIGN AND CONSTRUCT WAREHOUSE AT CAMP PROSPERITY, BAGHDAD, IRAQ. | |
Scope of Work |
Design and Construct 50 ft x 150 ft x 15 ft enclosed warehouse. The 15 feet height clearance shall be measured from finish floor to bottom of beam. Engineering concrete foundation footing design and constructionEngineering metal structure design and constructionProvide adequate power and lighting |
Client |
U.S. Army, Iraq |
Prime Contractor |
Kellogg Brown & Roots (KBR) –Camp Liberty – Baghdad |
Contract Number |
GCA8YM-VC-SF00329 |
Date of Award |
January 2009 |
Project Name: FABRICATION, INSTALLATION AND COMMISSIONING OF ACCOMMODATION AND OFFICE UNITS FOR UNAMI IRAQ, AT VICTORY BASE CAMP | |
Scope of work |
- Site preparation works like grading, leveling and compaction.Supply and installation of T walls Construction of walkways |
Client |
UNAMI |
Contract Number |
AMI/CON/2010/032 |
Date of Award |
September 2010 |
Duration |
3 months |
Project Name: DESIGN MANUFACTURE AND INSTALL TRIPLE WIDE TRAILERS IN ACCORDANCE WITH SOW IN TALLIL, IRAQ | |
Client |
U.S. Air force, Iraq |
Contract Number |
W91GXE-08-C-0117 |
Date of Award |
December 2008 |
Project Name: CONSTRUCTION OF 11 PORTABLE BUILDINGS & CAMP SETTING AT CAMP VICTORY NORTH, BAGHDAD | |
Client |
US Army, Iraq |
Contract Number |
W91GER-07-M-008 |
Date of Award |
March 2007 |
Project Name: MANUFACTURE & SUPPLY OF 150 EA3ROOM LIVINGCONTAINERS,CAMP FALCON,BAGHDAD |
Client |
PARC FORCES, JOINT CONTRACTING COMMAND, IRAQ |
Contract Number |
W91GET-07-C-1000 |
Date of Award |
2nd June 2007 |
Project Name: DESIGN, MANUFACTURE & SUPPLY 98 UNITS OF 45 FEET (WITH HEAVY STEEL SUPERSTRUCTURE) THERMO KING REFRIGERATED CONTAINERS |
Client |
Kellogg Brown & Roots (KBR) - Camp Anaconda, Balad -Iraq |
Contract Number |
VA11456 |
Date of Award |
10th May 2004 |
Project Name: DESIGN, MANUFACTURE & SUPPLY ADDITIONAL 40 UNITS OF45 FEET (WITH HEAVY STEEL SUPERSTRUCTURE) THERMO KING REFRIGERATED CONTAINERS TO CAMP ANACONDA, BALAD -IRAQ | |
Kellogg Brown & Roots (KBR) - Camp Anaconda, Iraq. |
|
Contract Number |
VA11456 – With a CHANGE ORDER for additional 40 units |
Date of Award |
July 2004 |
Reference Contact/ Buyer |
Ms. MersijaSlijivinak |
Project Name: SUPPLY OF 40FT SHIPPING CONTAINERS | |
Company / Organization |
Kellogg Brown & Roots (KBR) - Baghdad |
Contract Number |
F002219 |
Date of Award |
July 2006 |
Project Name: MANUFACTURE & SUPPLY OF 3ROOM LIVING CONTAINER, LATRINE UNITS, & SHOWER UNITS (TOTAL 72 UNITS) TO CAMP VICTORY NORTH, BAGHDAD | |
Company / Organization |
Kellogg Brown and Roots Co (KBR) - Iraq |
Contract Number |
F003075 |
Date of Award |
September 2006 |
Project Name: MANUFACTURE & SUPPLY OF 3ROOM LIVING CONTAINER, 2 ROOM LIVING CONTAINER, LATRINE UNITS, & SHOWER UNITS (TOTAL 110 UNITS) TO CAMP VICTORY NORTH, BAGHDAD | |
Company / Organization |
Kellogg Brown and Roots Co (KBR) - Iraq |
Contract Number |
F003870 |
Date of Award |
12 December 2006 |
Project Name: MANUFACTURE & SUPPLY OF LATRINE UNITS, & SHOWER UNITS (TOTAL 21 UNITS) TO CAMP VICTORY NORTH, BAGHDAD | |
Company / Organization |
Kellogg Brown and Roots Co (KBR) - Iraq |
Company / Organization |
Kellogg Brown and Roots Co (KBR) - Iraq |
Contract Number |
F004356 |
Date of Award |
04 March 2007 |
Project Name: MANUFACTURE & SUPPLY OF LATRINE UNITS, & SHOWER UNITS (TOTAL 25 UNITS) TO CAMP VICTORY NORTH, BAGHDAD | |
Company / Organization |
Kellogg Brown and Roots Co (KBR) - Iraq |
Contract Number |
F004554 |
Date of Award |
14 March 2007 |
Project Name: MANUFACTURE & SUPPLY OF LATRINE UNITS, & SHOWER UNITS (TOTAL 27 UNITS) TO CAMP VICTORY NORTH, BAGHDAD | |
Company / Organization |
Kellogg Brown and Roots Co (KBR), Iraq |
Contract Number |
F004647 |
Date of Award |
17 March 2007 |
Project completion |
20th April 2007 |
Reference Contact/ Buyer |
Mr. T.J.Grizzle |
Project Name: MANUFACTURE & SUPPLY OF LATRINE UNITS, & SHOWER UNITS (TOTAL 18 UNITS) TO CAMP VICTORY NORTH, BAGHDAD | |
Company / Organization |
Kellogg Brown and Roots Co (KBR), Iraq |
Contract Number |
F004626 |
Date of Award |
16 March 2007 |
Project completion |
20th April 2007 |
Reference Contact/ Buyer |
Mr. T.J Grizzle |
Project Name: INSTALL OF TRIPLE WIDE TRAILERS | |
Company / Organization |
JCC I/A RCC Tallil Airbase, Iraq |
Contract Number |
W91GXE-09-P-0202 |
Date of Award |
26th Feb 2009 |
Reference Contact/ Buyer |
Mr.T.J.Grizzle |
Project Name /Description: ISABOSS-Subcontract Worker Temporary Labor Personnel – Isa Airbase | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Ismir Residovic |
Contract Number |
CSC-ISABOSS-MA0001 |
Date of Award |
Renewed - 1st September 2014 – till date |
Scope of Work |
The contractor shall supply required labor to Isa Air Base. |
Project Name /Description: Light Set (Tower) Lease w/Maintenance Service | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Ismir Residovic |
Contract Number |
CSC-ISABOSS-SK0003 |
Date of Award |
Renewed - 1st September 2014 – till date |
Scope of Work |
Provide Light Set (Tower) Lease w/Maintenance Service at Isa Air Base and surrounding sites, Kingdom of Bahrain. |
Project Name /Description: ISABOSS-Equipment Lease and Equipment Services –Isa Airbase | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Ms. Fatima Hodzic |
Contract Number |
CSC-ISABOSS-MA0010 |
Date of Award |
Renewed - 1st September 2014 – till date |
Scope of Work |
The contractor shall supply required equipments to Isa Air Base. |
Project Name /Description: ISA-BOSS- On call Portable Water Delivery Service | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Ismir Residovic |
Contract Number |
CSC-ISABOSS-SK0008 |
Date of Award |
Renewed - 24th September 2014 – till date |
Scope of Work |
Provide on-call fresh water delivery services at Isa Air Base, Kingdom of Bahrain. |
Project Name /Description: Construction of Prefabricated Modular Ablution (One Female & One Male ablution units) at AV Unit Bahrain–Isa Airbase | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Roger |
Contract Number |
Work Order#1548708 |
Date of Award |
5th April 2016 (completed) |
Scope of Work |
The contractor shall provide labor and equipments to construct ablution units to Isa Air Base |
Project Name /Description: On call Heavy Equipment – Mobile Cranes | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Ms. Sharon Anderson |
Contract Number |
CSC-LCIV-BAH-MA0110 |
Date of Award |
21st January 2013 (completed) |
Scope of Work |
The contractor shall provide all labor, materials, supervision, equipment, transportation and all other services and appurtenances necessary to provide Equipment lease and equipmentservice. |
Project Name /Description: Light Set (Tower) Lease w/Maintenance Service | |
Client |
Isa Air Base and surrounding sites, Kingdom of Bahrain |
Point of Contact |
Mr. Timothy Martinez |
Contract Number |
CSC-LCIV-BAH-MA0041 |
Date of Award |
20 June 2009 (completed) |
Scope of Work |
Provide Light Set (Tower) Lease w/Maintenance Service at Isa Air Base and surrounding sites, Kingdom of Bahrain. |
Project Name /Description: Solid Waste Removal service at Isa Air Base | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Ms. Sharon Anderson |
Contract Number |
CSC-LCIV-BAH-MA0117 |
Date of Award |
1st April 2013 (completed) |
Scope of Work |
The contractor shall provide all labor, dumpsters, supervision, equipment, and all other services necessary to perform daily waste removal service. |
Project Name /Description: Traffic Sign Services–Isa Airbase | |
Client |
Isa Air Base and surrounding sites, Kingdom of Bahrain |
Point of Contact |
Ms. Amneh Abu Saleh / Ms. Sharon Anderson |
Contract Number |
CSC-LCIV-BAH-MA0120 |
Date of Award |
23 July 2013 (completed) |
Scope of Work |
The contractor shall provide traffic signs as per request at Isa Air Base. |
Project Name /Description: On-call Concrete, Fill dirt, Sand & Gravel Delivery | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Ms. Michelle Chavez |
Contract Number |
CSC-LCIV-BAH-MA0057 |
Date of Award |
17th October 2012 (completed) |
Scope of Work |
Provide on call fill dirt, sand, concrete & gravel delivery to Isa Air Base |
Project Name /Description: Turnkey Asphalt Paving Services–Isa Airbase | |
Client |
Isa Air Base and surrounding sites, Kingdom of Bahrain |
Point of Contact |
Mr. Tyler Aune / Ms. Sharon Anderson |
Contract Number |
CSC-LCIV-BAH-HSO0042 |
Date of Award |
22 August 2013 (completed) |
Scope of Work |
The contractor shall provide all labor, materials, supervision, equipment, transportation and all other services and appurtenances necessary to provide asphalt pavement services at Isa Air Base. |
Project Name /Description: Fencing Materials Delivery –Isa Airbase | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Ms. Lina Espinosa / Ms. Sharon Anderson |
Contract Number |
PO# 4750217948 |
Date of Award |
30 August 2013 (completed) |
Scope of Work |
The contractor shall deliver fencing materials to Isa Air Base. |
Project Name /Description: Turnkey Concrete & Paving Services–Isa Airbase | |
Client |
Isa Air Base and surrounding sites, Kingdom of Bahrain |
Point of Contact |
Ms. Sharon Anderson |
Contract Number |
CSC-LCIV-BAH-HSO0038 |
Date of Award |
10th June 2013 (completed) |
Scope of Work |
The contractor shall provide all labor, materials, supervision, equipment, transportation and all other services and appurtenances necessary to provide concrete and asphalt pavementservices at Isa Air Base. |
Project Name /Description: Fire Suppression inspection & assessment–Isa Airbase | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Reggie Chappa / Ms. Sharon Anderson |
Contract Number |
CSC-LCIV-BAH-HSO0041 |
Date of Award |
18th July 2013 (completed) |
Scope of Work |
Provide inspection and assessment of the FM200 fire suppression system on ISA Air Base, Bahrain (NAVY SITE #4. |
Project Name /Description: Male Ablution Unit Latrines (2 Units) | |
Client |
Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Ricky Maniago |
Contract Number |
PO # 4750209428 |
Date of Award |
13th November 2012 (completed) |
Scope of Work |
Provide labor and materials to install male ablution units – Latrines, Isa Air Base. |
Project Name /Description: Repair & certify Fire suppression at Isa Air Base, Bahrain | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Ms. Brankica |
Contract Number |
CSC-LCIV-BAH-HSO0035 |
Date of Award |
5th February 2013 (Completed- 1st April 2013) |
Scope of Work |
Repair and certify Fire suppression system at Isa Air Base. |
Project Name /Description: Provide & Install Sidewalk at Isa Air Base, Bahrain | |
Client |
Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Brian Ambridge |
Contract Number |
CSC-LCIV-BAH-HSO0022 |
Date of Award |
24th October 2012 (completed) {Duration 74 days} |
Scope of Work |
Provide and install sidewalks at various parts of Isa Air Base Bahrain. |
Project Name /Description: Fencing Materials Delivery to Isa Air Base, Bahrain | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Ms. Lina Espinosa |
Contract Number |
PO# 4750212119 |
Date of Award |
21st February 2013 (Completed on - 23rd March 2013) |
Scope of Work |
Delivery of fencing materials to Isa Air Base. |
Project Name /Description: Provide Nomex Coverall (various sizes) at Isa Air Base, Bahrain | |
Client |
Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Ms. Lina Espinosa |
Contract Number |
PO# 4750213261 |
Date of Award |
1st April 2013(Completed On 27th April 2013) |
Scope of Work |
Provide Coverall Nomex (Dupont Fabric) various sizes to Isa Air Base Bahrain. |
Project Name /Description: Perimeter Fencing Turn-Key Services | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Ismir Residovic |
Contract Number |
CSC-LCIV-BAH-MA0040 |
Date of Award |
01 May 2012 (Duration 120 days) |
Scope of Work |
Purchase, deliver and install a fence at Isa Air Base Bahrain. |
Project Name /Description: Keyed Entrance Locksets | |
Client |
Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Ms. SanjaMarcee |
Contract Number |
PO# 4750210097 |
Date of Award |
20th November 2012 (Duration 6 days) |
Scope of Work |
Delivery of Keyed entrance locksets to Isa Air Base, Kingdom of Bahrain |
Project Name /Description: Pre-engineered Modular Building 62’ x 102’ | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Ismir Residovic |
Contract Number |
CSC-LCIV-BAH-HSO0013 |
Date of Award |
6th August 2012 (Duration 8.5 months) |
Scope of Work |
Purchase, deliver and install Pre-engineered Modular Building at Isa Air Base Bahrain. |
Project Name /Description: Deliver & Install Pre-engineered Modular Building 40' x 72' | |
Client |
Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Ms. Michelle Chavez |
Contract Number |
CSC-LCIV-BAH-HSO0018 |
Date of Award |
11th September 2012 (Completed on 19th November 2012) |
Scope of Work |
Purchase, deliver and install Pre-engineered Modular Building at Isa Air Base Bahrain. |
Project Name /Description: CONCRETE SLABS Turn Key Service: 94 x 140 | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Ismir Residovic |
Contract Number |
CSC-LCIV-BAH-HSO0011 |
Date of Award |
17th July 2012 (Duration on 19th July 2012 – 17th September 2012) |
Scope of Work |
Provide concrete slabs of 94 feet x 140 feet x 8 inches at Isa Air Base Bahrain. |
Project Name /Description: Deliver & Install Pre-engineered Modular Building 40' x 84' | |
Client |
Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Ms. Michelle Chavez |
Contract Number |
CSC-LCIV-BAH-HSO0015 |
Date of Award |
6th September 2012 (Completed on 6th Sept – 11th Dec’12) |
Scope of Work |
Purchase, deliver and install Pre-engineered Modular Building at Isa Air Base Bahrain. |
Project Name /Description: Polymer Modified Asphalt Roadway Pavement | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Ms. Michelle Chavez |
Contract Number |
CSC-LCIV-BAH-HSO0006 |
Date of Award |
22ndMay 2012 (Duration on 25thMay 2012 – 30th June 2012) |
Scope of Work |
Purchase, deliver and install asphalt roadway at Isa Air Base Bahrain. |
Project Name /Description: Ea -Polymer Modified Asphalt Roadway Service | |
Client |
Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Ms. Michelle Chavez |
Contract Number |
CSC-LCIV-BAH-HSO0017 |
Date of Award |
12th September 2012 (Duration on 61 days) |
Scope of Work |
Purchase, deliver and install asphalt roadway at Isa Air Base Bahrain. |
Project Name /Description: Crushed Rock Delivery Services | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Ms. Sharon Anderson |
Contract Number |
CSC-LCIV-BAH-HSO0008 |
Date of Award |
19th June 2012 (Duration on 3 days) |
Scope of Work |
Crushed Rock Delivery Services at Isa Air Base and surrounding sites, Kingdom of Bahrain |
Project Name /Description: Concrete Slabs (1 EA – 6.5m x 10m x 10 cm) | |
Client |
Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Ismir Residovic |
Contract Number |
CSC-LCIV-BAH-HSO0016 |
Date of Award |
12th September 2012 (Duration on 29 days) |
Scope of Work |
Install concrete slabs at site 3 - Isa Air Base. |
Project Name /Description: Portable Toilet Lease & services | |
Client |
US Navy- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Ismir Residovic |
Contract Number |
CSC-LCIV-BAH-MA0061 |
Date of Award |
11th October 2012 (Duration on 21 days) |
Scope of Work |
The contractor shall provide portable toilets rental and cleaning services at Isa Air Base. |
Project Name /Description: 4 EA Concrete Footings | |
Client |
Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Ms. Brankica |
Contract Number |
CSC-LCIV-BAH-HSO0024 |
Date of Award |
1st November 2012 (Completed) |
Scope of Work |
Provide 4 EA concrete footers at Isa Air Base, Bahrain. |
Project Name /Description: Heavy Equipment Lease and Equipment Services | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Timothy Martinez / Ms. Sharon Anderson |
Contract Number |
CSC-LCIV-BAH-MA0019 |
Date of Award |
15th March 2011 (Duration 17th March 2011 - 10th October 2012) |
Scope of Work |
The contractor shall provide all labor, materials, supervision, equipment, transportation and all other services and appurtenances necessary to provide Equipment lease and equipment service., Kingdom of Bahrain |
Project Name /Description: Tent Erection & provide power supply to all the tents. | |
Client |
US. Navy, Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Ms. Kathy L. Thomerson |
Contract Number |
N33191-10-C-0508 |
Date of Award |
5 May 2010 (Completed){Duration 1 year} |
Scope of Work |
Provide materials and power supply for Government furnished tents. |
Project Name /Description: Pre-Fabricated Office RLBs | |
Client |
US Navy- Riffa& Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Christopher G. Dake |
Contract Number |
W912D1-09-P-0269 |
Date of Award |
5 September 2009 (Duration 67 days.) |
Scope of Work |
Provide Pre-fabricated office RLBs. |
Project Name /Description: Diesel Fuel Delivery | |
Client |
US Navy- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Kevin Giardini |
Contract Number |
N49400-10-B217 |
Date of Award |
9 September 2010 (Completed) {Duration 6 months} |
Scope of Work |
The contractor shall ensure that fuel is delivered to Government designated locations on ISA Airbase |
Project Name /Description: Diesel Fuel Delivery Contract | |
Client |
US Navy- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Kevin Giardini |
Contract Number |
N49400-10-D-0004 |
Date of Award |
1st October 2010 {Duration 6 months} |
Scope of Work |
The contractor shall ensure that fuel is delivered to Government designated locations on ISA Airbase. |
Project Name /Description: Diesel Fuel Delivery | |
Client |
US Navy- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Kevin Giardini |
Contract Number |
W912D1-09-P-0269 |
Date of Award |
5 September 2009 {Duration 67 days} |
Scope of Work |
The contractor shall provide the Government with a quotation for maximum of 60,000.00 liters of diesel fuel delivery, ISA Airbase. |
Project Name /Description: Dining Structural Rental | |
Client |
US Navy- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Gary B. Hall |
Contract Number |
N49400-11-B022 |
Date of Award |
22 Nov 2010 {Duration 4 months} |
Scope of Work |
The contractor shall provide a free standing dining structure to include power generation operations and maintenance required in order to provide on-site catering services at ISA Airbase. |
Project Name /Description: Diesel Fuel Delivery | |
Client |
US Navy- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Kevin Giardini |
Contract Number |
N49400-11-B064 |
Date of Award |
24th April 2011 {Duration 1 month} |
Scope of Work |
The contractor shall provide diesel fuel delivery, ISA Airbase. |
Project Name /Description: Porta John Rental | |
Client |
US Navy- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Kevin Giardini |
Contract Number |
N49400-11-P-B062 |
Date of Award |
25th April 2011 {Duration 4 months} |
Scope of Work |
The contractor shall provide portable toilets rental for 4months at ISA Airbase. |
Project Name /Description: Kitchen and Reefer units supply, delivery installation | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Ms. Jennifer Ruiz |
Contract Number |
W52P1J-07-D-0009 (CSC-LCIV-BAH-MA0014) |
Date of Award |
28th October 2010 {Duration 30 days (1st Nov’10 – 30th Nov’10)} |
Scope of Work |
The contractor shall provide all labor, materials, supervision, equipment, transportation and all other services necessary to supply, deliver and install food preparation facility and reefer units, ISA Airbase. |
Project Name /Description: Portable Toilet Leasing | |
Client |
US Navy- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Timothy Martinez |
Contract Number |
W52P1J-07-D-0009 (CSC-LCIV-BAH-MA0023) |
Date of Award |
11th Oct 2011 {Duration 366 days} |
Scope of Work |
The contractor shall provide all services and appurtenances necessary to provide portable toilet service at ISA Airbase. |
Project Name /Description: Leased Equipments and Equipment Services | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Ismir Residovic |
Contract Number |
W52P1J-07-D-0009 (CSC-LCIV-BAH-MA0019) |
Date of Award |
27th January 2011 {Duration 365 days - On call basis (11st Oct’11 – 10th Oct’12)} |
Scope of Work |
The contractor shall provide all labor, materials, supervision, equipment, transportation and all other services and appurtenances necessary to provide Equipment lease and equipmentservice, ISA Airbase |
Project Name /Description: Kitchen Equipments Supply | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Mr. Jennifer Ruiz |
Contract Number |
W52P1J-07-D-0009 (CSC-LCIV-BAH-MA0014) |
Date of Award |
1st Nov 2010 {Duration 30 days (1st Nov’10 – 30th Nov’10)} |
Scope of Work |
The contractor shall provide all materials, equipment, and transportation necessary to supply for food preparation facility and reefer units. |
Project Name /Description: Purchase of materials | |
Client |
KBR- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Ms. Lina Espinosa |
Contract Number |
4750178347 |
Date of Award |
21st January 2011 {Duration 1 month} |
Scope of Work |
The contractor shall provide all materials needed, ISA Airbase. |
Project Name /Description: PRE-FABRICATED OFFICE RLBS | |
Client |
US Navy- Isa Air Base, Kingdom of Bahrain |
Point of Contact |
Christopher G. Dake |
Contract Number |
W912D1-09-P-0202 |
Date of Award |
August 2009 {Duration 60 days} |
Scope of Work |
Provide all labor, equipment, supplies, design and materials to construct and install thirty-five (35) 12ft x 40ft RLB with four (4) separate rooms and steps |
Project Name: Transportation & Support Services for DCF | |
Scope Description: | Supply and Operations of Trucking Fleet inclusive of Vacuum Tankers , Bulkers , Flat Bed Trailers, Forklifts etc including manpower viz., Drivers / Operators / Fleet Coordinators / Plant Operators/ Mechanics / Helpers etc on 24x7 basis. |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | BAKER HUGHES , GE Company |
Contract Ref: | KOC #16051458 Project # F012011 |
Project Start: | July , 2011 |
Project Duration: | Ongoing |
Project Location: | Based in North Kuwait & South Kuwait Mud Plants with operational coverage in entire KOC & Ratqa fields. |
Project Name: Civil works related to RMS,ISC & Other OSBL Area | |
Scope Description: | Civil, Mechanical & Pipe line Works |
Client: | Kuwait Oil Company (KOC) |
Prime Contractor: | Petrofac International Ltd |
Contract Ref: | KOC # 18052144 Project # JI2035/27-004 |
Project Start: | December, 2018 |
Project Duration: | 22 DEC 2020 |
Project Location: | South East Kuwait, Near Magwa Area, KOC |
Project Name: Civil works for Lower Fars Heavy Oil Development Program(Phase 1) | |
Scope Description: | Civil works for Lower Fars Heavy Oil Development Program(Phase 1) |
Client: | Kuwait Oil Company (KOC) |
Prime Contractor: | Petrofac International Ltd., |
Contract Ref: | KOC # 15050901 Project # JI2035/30-002 |
Project Start: | July, 2015 |
Project Duration: | 6 months |
Project Location: | LFHO-Site Office Located to the North of Kuwait about 115Km Approx away from Kuwait City. |
Project Name: Civil Works pertaining to Manifold and associated Subgroup Manifolds for GC 29,MGT(Manifold Group Trunkline) System for the GC 29,GC 30 and GC 31 in North Kuwait for KOC | |
Scope Description: | Civil Works pertaining to Manifold and associated Subgroup Manifolds for GC 29,MGT(Manifold Group Trunkline) System for the GC 29,GC 30 and GC 31 in North Kuwait for KOC |
Client: | Kuwait Oil Company (KOC) |
Prime Contractor: | Petrofac International Ltd., |
Contract Ref: | KOC # 15051614 Project # JI-2031/30-001 |
Project Start: | January, 2016 |
Project Duration: | 6 months |
Project Location: | Manifold Group Trunkline (MGT) System for GC-29,30 & 31 Project, Abdally, North Kuwait |
Project Name: Construction of New Elevated 11kv Main Intake (72MW) Raudhatain - E Substation | |
Scope Description: | Construction of New Elevated 11KV Main Intake (72MW)RAWDATHEIN – E Sub Station Building |
Client: | Kuwait Oil Company (KOC) |
Prime Contractor: | Bader Al- Mulla& Bros. Co. W.L.L |
Contract Ref: | KOC # 14050573 |
Project Start: | June, 2015 |
Project Duration: | 1.5 Yrs |
Project Location: | Rawdhathein-E Substation, North Kuwait |
Project Name: Installation of Above Ground RTRP Piping works , Storm Water and Sanitary Sewer Piping Works (RTRP & CS)related to New Gathering Centre GC 29 in North Kuwait | |
Scope Description: | RTRP piping in Tanks Area |
Client: | Kuwait Oil Company (KOC) |
Prime Contractor: | Petrofac International Ltd., |
Contract Ref: | KOC # 14050476 Project # JI-2027/27-005 |
Project Start: | November, 2016 |
Project Duration: | 6 Months |
Project Location: | Project Location is in North Kuwait fields which lay Approx 70Kms North of Kuwait City. |
Project Name: Construction Of Local Manifold Foundation , Crash Barrier Work, Anchor Blocks,Structural cladding works for KOC, WARA Pressure Maintenance Project | |
Scope Description: | Construction Of Local Manifold Foundation And Crash Barrier Work |
Client: | Kuwait Oil Company (KOC) |
Prime Contractor: | GS Engineering And Construction |
Contract Ref: | Project # A110-01-KW-168 |
Project Start: | February, 2014 |
Project Duration: | 6 Months |
Project Location: | Burgan Site KOC |
Project Name: Pipeline Civil Works | |
Scope Description: | Excavation Works, Construction Of Anchor Blocks, Block Valve Station, Crash barrier, Manifold Foundation Works, Grading Fencing Works, Back Filling And Compaction Works |
Client: | Kuwait Oil Company (KOC) |
Prime Contractor: | SAIPEM |
Contract Ref: | Project # 691165 |
Project Start: | January, 2012 |
Project Duration: | 03 Months |
Project Location: | At KOC Site BS171 |
Project Name: Design, Fabrication, Supply And Installation Of Substation,MCC& Control Room Building | |
Scope Description: | Design, Fabrication, Supply And Installation Of Substation Building Which Includes All Structural Works And Civil Works |
Client: | Kuwait Oil Company (KOC) |
Prime Contractor: | SAFWAN PETROLEUM Engineering Technologies Company |
Contract Ref: | Project # LW0/3018/10 |
Project Start: | February, 2010 |
Project Duration: | 05 Months |
Project Location: | Works At West Kuwait GC16 For Kuwait Oil Co |
Project Name: CONSTRUCTION OF TEMPORARY FACILITIES WORK | |
Scope Description: | Civil, Mechanical & Electrical Works |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | Honeywell Kuwait |
Sub-Contractor: | TRANSATLANTIC GENERAL TRADING & CONTRACTING COMPANY |
Contract Ref: | KOC # 18052249 |
Project Start: | December, 2018 |
Project Duration: | 90 days |
Project Location: | South East Kuwait, Near Magwa Area, KOC |
Project Name: PERIMETER FENCING WORK | |
Scope Description: | Civil/Mechanical Fencing Works |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | MVL-AL OTHMAN |
Sub-Contractor: | TRANSATLANTIC GENERAL TRADING & CONTRACTING COMPANY |
Contract Ref: | KOC # W912ER18C0020 |
Project Start: | November, 2018 |
Project Duration: | Ongoing |
Project Location: | Camp Arifjan, Kuwait |
Project Name: EPC OF TEMPORARY CONSTRUCTION FACILITIES FOR NEW GATHERING CENTRE – GC 32 IN SOUTH KUWAIT | |
Scope Description: | Engineering, Procurement & Construction of entire TC facilities including Site Offices, Warehouses, Laydown Yard, Access Roads, Security Fencing, CCTV Networks and allied works. |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | PETROFAC INTERNATIONAL LTD., |
Contract Ref: | KOC # 17051820 Project # JI-2035/30-002 |
Project Start: | September, 2017 |
Project Duration: | 6 months |
Project Location: | South East Kuwait, Near Magwa Area, KOC |
Project Name: LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM(PHASE 1) | |
Scope Description: | Civil works for Lower Fars Heavy Oil Development Program(Phase 1) |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | PETROFAC INTERNATIONAL LTD., |
Contract Ref: | KOC # 15050901 Project # JI2029/30-002 |
Project Start: | July, 2015 |
Project Duration: | 6 months |
Project Location: | LFHO-Site Office Located to the North of Kuwait about 115Km Approx away from Kuwait City. |
Project Name: New GC 29 in North Kuwait | |
Scope Description: | RTRP piping in Tanks Area |
Client: | KUWAIT OIL COMaPANY (KOC) |
Prime Contractor: | PETROFAC INTERNATIONAL LTD., |
Contract Ref: | KOC # 14050476 Project # JI-2027/27-005 |
Project Start: | November, 2016 |
Project Duration: | 6 Months |
Project Location: | Project Location is in North Kuwait fields which layApprox 70Kms North of Kuwait City. |
Project Name: MGT (MANIFOLD, GROUP TRUNKLINE) SYSTEM FOR THE GCs 29, 30 & 31 | Scope Description: | Civil Works pertaining to Manifold and associated Subgroup Manifolds for GC 29,MGT(Manifold Group Trunkline System for the GC 29,GC 30 and GC 31 in North Kuwait for KOC |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | PETROFAC INTERNATIONAL LTD., |
Contract Ref: | KOC # 15051614 Project # JI-2031/30-001 |
Project Start: | January, 2016 |
Project Duration: | 6 Months |
Project Location: | Manifold Group Trunkline (MGT) System for GC-29,30 & 31 Project, Abdally, North Kuwait |
Project Name: CONSTRUCTION OF NEW ELEVATED 11KV MAIN INTAKE (72MW) RAUDHATAIN - E SUBSTATION | |
Scope Description: | Construction of new elevated 11KV main intake (72MW)RAWDATHEIN – E Sub Station Building |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | BADER AL- MULLA & BROS. CO. W.L.L |
Contract Ref: | KOC # 14050573 |
Project Start: | June, 2015 |
Project Duration: | 1.5 Yrs |
Project Location: | Construction of New Elevated 11Kv Main Intake (7Mw) Rawdhathein-E Substation, North Kuwait |
Project Name: Installation of Heavy Duty Rubber flooring for KOC Mobile Plant-Engine Workshop | |
Scope Description: | Heavy Duty Rubber flooring Work |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | Trans Atlantic Group Co |
Contract Ref: | KOC # 16051440 |
Project Start: | December, 2016 |
Project Duration: | 03 Months |
Project Location: | Construction of New Elevated 11Kv Main Intake (7Mw) Rawdhathein-E Substation, North Kuwait |
Project Name: New GC 29 In North Kuwait | |
Scope Description: | Refurbishment of Laydown Area |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | Petrofac International |
Contract Ref: | KOC # 14050476 Project # JI2027/24-001 |
Project Start: | December, 2015 |
Project Duration: | 02 Months |
Project Location: | Nearby KOC Gate No.1 , North Kuwait |
Project Name: Mgt (Manifold, Group Trunkline) System For The GCs 29, 30 & 31 | |
Scope Description: | EPC of Temporary Site Facilities |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | Petrofac International |
Contract Ref: | KOC # 15051614 Project # JI2031/30-001 |
Project Start: | January, 2016 |
Project Duration: | 03 Months |
Project Location: | Inside KOC, Nearby CIPF, North Kuwait |
Project Name: Repair & Application of Epoxy Coating on floor of Hanger 160 & Preservation Room | |
Scope Description: | Repair & Application of Epoxy Coating on floor |
Client: | Kuwait Oil Company (KOC) |
Prime Contractor: | Trans Atlantic Group Co. |
Contract Ref: | KOC # 16051348 |
Project Start: | October, 2016 |
Project Duration: | 1.5 Months |
Project Location: | KOC Hanger-160, Ahmadi South Kuwait |
Project Name: New Water Centre In North Kuwait | |
Scope Description: | Temporary Site Facilities for NWC |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | G S Engineering & Construction |
Contract Ref: | Project # 15050-GS-SCA-001 |
Project Start: | December , 2015 |
Project Duration: | 4 Months |
Project Location: | Inside KOC, Nearby CIPF, North Kuwait |
Project Name: LOWER FARS HEAVY OIL DEVELOPMENT PROGRAM (PHASE 1) | |
Scope Description: | Refurbishment of Existing office facilities, including New Company office at EOF,South Kuwait |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | Petrofac International Ltd |
Contract Ref: | KOC # 15050901 Project # JI2029/30-002 |
Project Start: | July, 2015 |
Project Duration: | 3 Months |
Project Location: | KOC South Kuwait |
Project Name: KOC, WARA Pressure Maintenance Project | |
Scope Description: | Construction Of Local Manifold Foundation And Crash Barrier Work |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | GS Engineering And Construction |
Contract Ref: | Project # A110-01-KW-168 |
Project Start: | February, 2014 |
Project Duration: | 3 Months |
Project Location: | Burgan Site KOC |
Project Name: KOC, WARA Pressure Maintenance Project | |
Scope Description: | Construction Of Anchor Blocks |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | GS Engineering And Construction |
Contract Ref: | KOC # EF/1772 Project # 101920 |
Project Start: | September , 2011 |
Project Duration: | 3 Months |
Project Location: | Burgan Field & South East Kuwaiti Fields |
Project Name: WARA Pressure Maintenance Project | |
Scope Description: | Temporary Electricity Facility Work |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | GS Engineering And Construction |
Contract Ref: | Project # 101920 #11050146-SO-CM-008 |
Project Start: | September , 2011 |
Project Duration: | 1 Month |
Project Location: | Burgan Field & South East Kuwaiti Fields |
Project Name: WARA, Pressure Maintenance Project | |
Scope Description: | Cable Trenching Work |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | GS Engineering And Construction |
Contract Ref: | Project # 101920 #11050146-SO-CM-004 |
Project Start: | September , 2011 |
Project Duration: | 4 Months |
Project Location: | Burgan Field & South East Kuwaiti Fields |
Project Name: WARA, Pressure Maintenance Project | |
Scope Description: | Construction of Temporary Facilities Work |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | GS Engineering And Construction |
Contract Ref: | Project # 101920 #A110-01-KW168 |
Project Start: | March , 2012 |
Project Duration: | 4 Months |
Project Location: | Burgan KOC Field |
Project Name: WARA, Pressure Maintenance Project | |
Scope Description: | Supply & Installation of Shelter Cladding Works |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | GS Engineering And Construction |
Contract Ref: | Project # 11050146-GS-TAG-SO-004 |
Project Start: | February , 2015 |
Project Duration: | 02 Months |
Project Location: | Burgan KOC Field |
Project Name: JI-2004 Effluent Water Injection And Central Sea Water Injection | |
Scope Description: | Design, Engineering Management, Expertise, Supervision, Labor, Provision, Furnishing, Construction, Plant, Tools & Tackles, Consumables, Scaffolding of Temporary Facilities |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | PETROFAC |
Contract Ref: | KOC# 45654 Project # JI 2004 |
Project Start: | January 2011 |
Project Duration: | 6 Months |
Project Location: | CIPF & GC 25,Inside KOC, North Kuwait |
Project Name: Site Preparation And CIPF Plant Area Earth Works Effluent Water Injection Phase 1 And Sea Water Injection Phase 2 | |
Scope Description: | Site Grading, Leveling By Cut And Fill With Slope Protection Disposal Of Excess Excavated Soil To The Approved Site |
Client: | Kuwait Oil Company (KOC) |
Prime Contractor: | LARSEN & TOUBRO KUWAIT CONSTRUCTON |
Contract Ref: | Project # LTKC/2004/TAGT/003 |
Project Start: | May, 2011 |
Project Duration: | 04 Months |
Project Location: | Central Injection Processing Facility, North Kuwait |
Project Name: Construction Of Pipeline Right Of Way And Associated Work | |
Scope Description: | Site grading, leveling and marking of points. Disposal of excess excavated soil to the approved site Construction of Right of way |
Client: | Kuwait Oil Company (KOC) |
Prime Contractor: | Petrofac International Co. |
Contract Ref: | JI/2004/ROW/Misc/13 |
Project Start: | October, 2011 |
Project Duration: | 2.5 Months |
Project Location: | North Kuwait CIPF, CG15/25, CG23, SWTP & Laydown Area (near KOC Security Gate) |
Project Name: Lease For Portable Cabin Fabrication, Supply, Installation And Commissioning Of Portable Cabin Fabrication Supply, Installation And Commissioning | |
Scope Description: | Supply of Porto cabin fabrication, supply, installation and commissioning. |
Client: | Kuwait Oil Company (KOC) |
Prime Contractor: | SAIPEM |
Contract Ref: | Project # SKB/75/76/69/89/104 |
Scope Description: | Construction of site offices and warehouse. Erection of warehouse (pre engineered building structure) Construction of equipment foundation, generator pads etc. Installation of pre-cast foundation for temporary construction facilities. Fabrication and installation of corrugated sheet fencing 2000m.installation of car parking shelters for 150 cars. Sanitation facilities and potable water facilities. Construction of temporary roads including grading, compaction and lying of milled asphalt and construction of bund walls around the periphery. |
Client: | Kuwait Oil Company (KOC) |
Project Start: | August, 2011 |
Project Duration: | 02 Months |
Project Location: | Inside KOC, South Kuwait |
Project Name: PIPELINE CIVIL WORKS | |
Project Name: | PIPELINE CIVIL WORKS |
Scope Description: | Excavation Works, Construction Of Anchor Blocks, Block Valve Station, Crash barrier, Manifold Foundation Works, Grading Fencing Works, Back Filling And Compaction Works |
Client: | Kuwait Oil Company (KOC) |
Prime Contractor: | SAIPEM |
Contract Ref: | Project # 691165 |
Project Start: | January, 2012 |
Project Duration: | 03 Months |
Project Location: | At KOC Site For SAIPEM |
Project Name: Design, Fabrication, Supply And Installation Of Substation Building | |
Scope Description: | Design, Fabrication, Supply And Installation Of Substation Building Which Includes All Structural Works And Civil Works |
Client: | Kuwait Oil Company (KOC) |
Prime Contractor: | SAFWAN PETROLEUM Engineering Technologies Company |
Contract Ref: | Project # LW0/3018/10 |
Project Start: | February, 2010 |
Project Duration: | 05 Months |
Project Location: | Works At West Kuwait GC16 For Kuwait Oil Co |
Project Name: Design, Fabrication, Supply and Installation Of MCC And Control Room | |
Scope Description: | Design, Fabrication, Supply and Installation Of MCC And Control Room Which Includes All Structural Works And Civil Works |
Client: | Kuwait Oil Company (KOC) |
Prime Contractor: | SAFWAN PETROLEUM Engineering Technologies Company |
Contract Ref: | Project # LW0/3020/10 |
Project Start: | February, 2010 |
Project Duration: | 04 Months |
Project Location: | GC-16 West Kuwait |
Project Name: Construction& Maintenance Of Temporary Facilities For Installation of Fuel Gas Oil Pipe Lines And Pumping Station | |
Scope Description: | Construction Of Site Offices And Warehouse. Erection Of Warehouse (Pre-Engineered Building Structure Construction Of Equipment Foundation, Generator Pads Etc. |
Client: | Kuwait Oil Company (KOC) |
Prime Contractor: | Petrofac International Co. |
Contract Ref: | JI/2004/ROW/Misc/13 |
Project Start: | November, 2010 |
Project Duration: | 03 Months |
Project Location: | AL Wafra, Mina Azzour, Mina Ahmadi- South Kuwait |
Project Name: Construction of Temporary Facilities Work for DCs upgrade at GC 9,10,20 & 22 | |
Scope Description: | Civil, Mechanical & Electrical Works |
Client: | Kuwait Oil Company (KOC) |
Prime Contractor: | Honeywell Kuwait |
Sub-Contractor: | TransAtlantic General Trading & Contracting Company |
Contract Ref: | KOC # 18052249 |
Project Start: | December, 2018 |
Project Duration: | 90 days |
Project Location: | South East Kuwait, Near Magwa Area, KOC |
Project Name: EPC Of Temporary Construction Facilities For New Gathering Centre – GC 32 in South Kuwait | |
Scope Description: | Engineering, Procurement & Construction of entire TC facilities including Site Offices, Warehouses, Laydown Yard, Access Roads, Security Fencing, CCTV Networks and allied works. |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | PETROFAC INTERNATIONAL LTD., |
Contract Ref: | KOC # 17051820 Project # JI-2035/30-002 |
Project Start: | September, 2017 |
Project Duration: | 6 months |
Project Location: | South East Kuwait, Near Magwa Area, KOC |
Project Name: EPC of Temporary Site Facilities for MGT (Manifold, Group Trunkline) System For The GCs 29, 30 & 31 | |
Scope Description: | EPC of Temporary Site Facilities |
Client: | Kuwait Oil Company (KOC) |
Prime Contractor: | Petrofac International |
Contract Ref: | KOC # 15051614 Project # JI2031/30-001 |
Project Start: | January, 2016 |
Project Duration: | 03 Months |
Project Location: | Inside KOC, Nearby CIPF, North Kuwait |
Project Name: Temporary Site Facilities for New Water Centre In North Kuwait | |
Scope Description: | Temporary Site Facilities for NWC |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | G S Engineering & Construction |
Contract Ref: | Project # 15050-GS-SCA-001 |
Project Start: | December , 2015 |
Project Duration: | 4 Months |
Project Location: | Inside KOC, Nearby CIPF, North Kuwait |
Project Name: Refurbishment of Existing office facilities, including New Company office at EOF, South Kuwait for Lower Fars Heavy Oil Development Program (Phase 1) | |
Scope Description: | Refurbishment of Existing office facilities, including New Company office at EOF, South Kuwait |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | Petrofac International Ltd |
Contract Ref: | KOC # 15050901 Project # JI2029/30-002 |
Project Start: | July, 2015 |
Project Duration: | 3 Months |
Project Location: | KOC South Kuwait |
Project Name: Construction of Temporary Facilities Work for WARA, Pressure Maintenance Project | |
Scope Description: | Construction of Temporary Facilities Work |
Client: | Kuwait Oil Company (KOC) |
Prime Contractor: | GS Engineering And Construction |
Contract Ref: | Project # 101920 #A110-01-KW168 |
Project Start: | March , 2012 |
Project Duration: | 4 Months |
Project Location: | Burgan KOC Field |
Project Name: Temporary Facilities for JI-2004 Effluent Water Injection And Central Sea Water Injection | |
Scope Description: | Design, Engineering Management, Expertise, Supervision, Labor, Provision, Furnishing, Construction, Plant, Tools & Tackles, Consumables, Scaffolding of Temporary Facilities |
Client: | KUWAIT OIL COMPANY (KOC) |
Prime Contractor: | PETROFAC |
Contract Ref: | KOC# 45654 Project # JI 2004 |
Project Start: | January 2011 |
Project Duration: | 6 Months |
Project Location: | CIPF & GC 25,Inside KOC, North Kuwait |
Project Name: Construction& Maintenance Of Temporary Facilities For Installation of Fuel Gas Oil Pipe Lines And Pumping Station | |
Scope Description: | Construction Of Site Offices And Warehouse. Erection Of Warehouse (Pre-Engineered Building Structure Construction Of Equipment Foundation, Generator Pads Etc. |
Client: | Kuwait Oil Company (KOC) |
Prime Contractor: | Petrofac International Co. |
Contract Ref: | JI/2004/ROW/Misc/13 |
Project Start: | November, 2010 |
Project Duration: | 03 Months |
Project Location: | AL Wafra, Mina Azzour, Mina Ahmadi- South Kuwait |
Project Name: Supply and Installation works for Site office &Warehouses for Clean Fuel Project | |
Scope Description: | Supply and Installation works for Warehouses |
Location: | Mina Abdullah Kuwait |
Client: | KNPC |
Prime Contractor: | Consolidated Contractors Company |
Contract Ref: | JI/2004/ROW/Misc/13 |
Project Start: | March 2015 |
Project Duration: | 6 Months |
Project Location: | KNPC MAB Kuwait |